Phone: +086-0755-81475061  | E-Mail: kaiao@cn-rp.com
4
BLOG
You are here: Home » News » Industry News » What are the design requirements in the rapid prototyping process?

What are the design requirements in the rapid prototyping process?

Views: 7     Author: Site Editor     Publish Time: 2022-07-29      Origin: Site

In layman's terms, a prototype is one or several first made according to the product appearance drawings or structural drawings without the premise of opening the mold. It is used to check the rationality of the appearance or structure. What is the process of rapid prototyping? What time is it?

rapid prototyping

1) Inspection of the design


The prototype is not only visible but also touchable. It can intuitively reflect the designer's creativity in the form of natural objects, avoiding the drawback of "drawing good-looking but not good-looking." Therefore, prototyping is essential in new product development and product shape scrutiny.


(2) Check the structural design


Because the prototype can be assembled, it can intuitively reflect the structure's rationality and the installation's difficulty. It is convenient to detect and solve problems early.


(3) Avoid the risk of directly opening the mold


Since mold manufacturing costs are generally high, relatively large molds are worth hundreds of thousands or even millions. The loss can be imagined if an unreasonable structure or other problems are found in opening the mold. Prototype production can avoid this loss and reduce the risk of mold opening.


(4) Make the product launch time much earlier


Due to the advanced nature of prototyping, you can use prototyping for product promotion before the mold is developed and even pre-sales and production preparations to occupy the market as soon as possible.


rapid prototyping,sheet metal rapid prototyping,rapid prototyping companies


Leave a Message
Send A Message
Leave a Message
Send A Message

SERVICE

RESOURCES

INDUSTRIES

CONTACTS US

  +086-0755-81475061  / +86 13923414106
  kaiao@cn-rp.com
  Floor 2, Block 9, AoHua Industrial Park, DaLang HuaRong Road, LongHua District, Shenzhen City, Guangdong Province, PRC 518110
Copyright © 2020 Shenzhen Kaiao Mould Technology Co., Ltd. All Rights Reserved