Phone: +086-0755-81475061  | E-Mail: kaiao@cn-rp.com
English
quotation online rapid prototype
BLOG
You are here: Home » News

News and Events

  • What Are the Real Cost Drivers in Plastic 3D Printing Services?

    2025-12-17

    This article identifies the real cost drivers in plastic 3D printing services as material type, part volume and geometry, chosen printing technology, and post-processing requirements. It explains how these factors influence machine time, material consumption, and labor, significantly impacting the final price. The article also provides strategies for cost optimization, such as smart material and technology selection, design for additive manufacturing, and careful definition of finishing needs, to help clients manage their budgets effectively. Read More
  • Is Plastic 3D Printing Strong Enough for Functional Prototypes?

    2025-12-15

    This article confirms that plastic 3D printing is indeed strong enough for many functional prototypes, thanks to advancements in materials and technologies like SLS, FDM, and SLA. It emphasizes that achieving sufficient strength depends on selecting the right printing technology and engineering-grade materials (e.g., Nylon, PC, ULTEM), optimizing part design for additive manufacturing, and utilizing post-processing techniques like annealing or infiltration. While traditional methods remain superior for extreme loads or high-volume production, 3D printing offers significant advantages for rapid, cost-effective functional validation. Read More
  • When Should You Choose Plastic 3D Printing Over Traditional Manufacturing?

    2025-12-13

    This article details when to choose plastic 3D printing over traditional manufacturing methods. It highlights that 3D printing is superior for rapid prototyping, complex geometries, low-volume production, and custom parts due to its speed, design freedom, and lack of tooling costs. Conversely, traditional methods like injection molding are better for high-volume production, achieving the lowest per-part cost, and when superior mechanical properties or specific material certifications are required. The choice ultimately depends on the project's volume, complexity, budget, and stage of development. Read More
  • What Matters Most When Choosing A Prototype Supplier?

    2025-11-28

    What Matters Most When Choosing a Prototype Supplier?When choosing a prototype supplier, the most critical factors are their technical capabilities, communication and project management, quality control, and speed/lead times, as these directly impact the accuracy, reliability, and timely delivery of Read More
  • Injection Molding vs. Casting: Which Is Faster?

    2025-11-28

    This article provides a detailed comparison of injection molding and casting methods, focusing on their speed implications for rapid prototyping and production. It highlights that for initial small batches (20-50 units) and design iterations, casting (e.g., vacuum casting) is faster due to quicker, less expensive silicone mold fabrication (5-7 days). Conversely, injection molding, despite its longer initial tooling time (weeks to months), becomes faster for pilot runs (hundreds to thousands) and high-volume production due to its rapid per-part cycle times (seconds). The article emphasizes that the optimal choice depends on project volume, design stability, and urgency for initial parts, with KAIAO Rapid Manufacturing offering both services to meet diverse needs. Read More
  • Can Sheet Metal Prototypes Meet Tight Tolerances?

    2025-11-28

    This article explores the capabilities of modern sheet metal prototyping in meeting tight tolerances. It details how factors like material properties, part geometry, cutting technologies (laser, waterjet, punching), and bending processes (CNC press brakes, springback compensation) influence precision. The role of materials and thickness, along with post-processing and rigorous quality control (CMM, FAI), are highlighted as crucial for ensuring accuracy. The article outlines typical achievable tolerances, ranging from ±0.1mm to ±0.05mm for critical features, and emphasizes the importance of design for manufacturability and partnering with experienced fabricators like KAIAO Rapid Manufacturing to achieve project-specific precision requirements. Read More
  • Which Method Cuts Prototype Costs Most?

    2025-11-28

    This article provides an in-depth analysis of various rapid prototyping methods and their cost-saving potential. It details how 3D printing reduces costs for complex, low-volume designs by eliminating tooling, while CNC machining is cost-effective for high-precision, functional parts made from production materials. The article also highlights vacuum casting for small batches needing injection-molded quality, rapid injection molding for pilot runs, and sheet metal fabrication for durable metal components. It emphasizes that the most effective method depends on specific project requirements like complexity, material, volume, and purpose, offering practical advice and a comparative table to guide decision-making for optimal budget management. Read More
  • CNC or 3D Printing: Which Fits Your Prototype?

    2025-11-28

    This article provides a concise guide to choosing between CNC machining and 3D printing for rapid prototyping. It highlights CNC's strengths in precision, material strength, and production-like finishes for functional parts, with lead times as fast as 1 day. Conversely, it emphasizes 3D printing's advantages in handling complex geometries, offering rapid and cost-effective iterations for early-stage validation, typically within 4-6 days. The article details material comparisons, cost/lead time differences, and variations in surface finish and tolerances, concluding with a decision matrix to help users select the optimal method based on their project's specific needs. Read More
  • Top Factors That Affect the Cost and Lead Time of Rapid Prototyping

    2025-11-14

    Unlocking Efficiency: Top Factors That Affect the Cost and Lead Time of Rapid PrototypingThe primary factors that affect the cost and lead time of rapid prototyping are part complexity and size, material choice, manufacturing technology (like 3D printing or CNC machining), required tolerances, post- Read More
  • Total 27 pages  Go to Page
  • Go

SERVICE

RESOURCES

Leave a Message
Send A Message

INDUSTRIES

CONTACTS US

  +086-0755-81475061  / +86 13823544576
  kaiao@cn-rp.com
  Floor 2, Block 9, AoHua Industrial Park, DaLang HuaRong Road, LongHua District, Shenzhen City, Guangdong Province, PRC 518110
Copyright © 2020 Shenzhen Kaiao Mould Technology Co., Ltd. All Rights Reserved  Technical support: Molan Network